Notícias

How To Maintain Emulsifier Equipment? Please Remember Six Steps!

Horário de publicação: Autor: Editor do Site Visita: 30

How to maintain emulsifier equipment? Emulsification is an important part of the environmental protection water department. It refers to the process of removing or reducing solid pollutants and organic pollutants in different types of sewage through professional treatment methods, so that the purified water quality meets the requirements of reuse or discharge. At present, emulsification has been widely used in agriculture, petrochemicals, medical care, catering and other fields. At present, the activated sludge method and its derivative processes, such as A2O method, SBR method, oxidation ditch method, AO method, etc., are mostly used in domestic emulsification plants. However, in order to achieve the long-term emulsification effect, the maintenance of emulsification equipment is crucial. How to operate specifically?

1. Remove the grid residue at the prescribed time. The number of washing and disinfection should be increased during the flood season to ensure smooth water flow. When the grid decontamination machine is in working condition, once the monitoring equipment is found to be faulty, it must be shut down for timely maintenance.

2. Equipment maintenance in the water inlet and outlet areas is generally, and the lubricating oil at the emulsifier loading and unloading seal is checked and adjusted every six months. The float level gauge and conversion device of the water collecting tank should also be regularly inspected and maintained.

3. Maintenance and maintenance of the emulsifier. Regularly check, adjust or replace the inlet and outlet gate valves of the emulsifier. Regularly check the water level of the lifting tank and its conversion device facilities. To ensure that the standby emulsifier can work properly, it is generally guaranteed to be tested once a month. When the temperature is below 0℃, the water in the pump casing should be discharged in time.

4. Fan maintenance work It is strictly forbidden to run the fan when there is no oil or lack of oil. The lubricating oil must be checked before starting. And do a good job of regular inspections. If abnormal conditions are found, they must be stopped in time and detailed inspections must be carried out. Check the bearing lubricating oil and water-cooling and air-cooling pipes, and generally repair them once every three months.

5. When the maintenance work of the emulsifier involves the emulsifier, the corresponding inspection work should also be done, and the debris in the dosing tank should be cleaned regularly. The lubrication of the agitator and the metering pump should be checked regularly, and the general maintenance interval is also three months.

6. Maintenance of the aerated grit chamber.

Adjust the limit device of the emulsifier once a month. Ensure the smooth operation of the sand discharge pipe, drainage channel and sand-water separator. Ensure the hygiene of the grit chamber, related equipment and related components.

The above is the maintenance method of High Shear Emulsifier. Only by better maintaining the emulsifier can the emulsifier play its due role.

How To Maintain Emulsifier Equipment? Please Remember Six Steps!

Este site utiliza cookies

Utilizamos cookies para recolher informações sobre como utiliza este website. Utilizamos estas informações para fazer com que o site funcione da melhor forma possível e melhorar os nossos serviços.